So I thought I had posted pictures of Valkyr’s hard dodger long ago but it seems that I didn’t. These are not the best formatted pictures but should help to give an idea of what I did.
Starboard view of whole dodger frame
We had 1/4 inch aluminum plates welded into frame to bolt the top rails onto. In finished dodger this is what actually holds it to dodger. There are 6 of them.
Aft partial view of dodger frame
We drilled the holes to mount frame to boat and then filled with epoxy and drilled again to make sure we would never have an issue with water penetration into the core.
Underside of one of backing plates for top rails.
aft portside view of entire dodger frame
dodger bolted down with sealant.
sealant to keep water from running down the bolt.
again sealant to keep water from running down bolt. All epoxy filled holes through deck were counter sunk to allow the built up sealant around bolt here to fill and compress in the holes.
Temp attachment of forward port side handrail on dodger.
temp attachment on starboard
port side view of dodger frame
Middle starboard side attachment for handrail.
Solar panels on dodger roof. We used a adhesive sealant to attach them to roof. It has held really good. Forget what it is called, something kevlar 400? from PPG.
another view of solar panels. Each one of the panels is 25 watts. They are a thin flexible panel that it is safe to walk on. There are
junction box closed
another view under dodger. If you notice the chips in the white paint on the aft upper edge of the dodger, That edge takes a beating sometimes an has to be touched up on a regular ( annual basis )
Hand rails being attached to the top of dodger once roof is installed.
Kaylin helping paint!!
Zsanic in the galley and kaylin hanging out under dodger.
Good view of the aft rail that protects solar panels and dodger top from boom if it falls.
Showing posts with label s/v Valkyr. Show all posts
Showing posts with label s/v Valkyr. Show all posts
Tuesday, February 7, 2017
Valkyr’s Hard Dodger
Scott aboard s/v Valkyr needed more solar power to run his A/C (he is in Florida). And shade is also a very nice thing... So he took on the project of making a hard dodger to support all those new solar panels. This is not strictly a small boat project, but shows some excellent construction techniques. Enjoy!
Labels:
carpentry,
cockpit,
deck,
s/v Valkyr,
solar
Thursday, February 27, 2014
(Almost) New mast
Scott runs a website dedicated to Downeaster yachts - a noble undertaking. As such, he receives submissions from others; what follows below is one of those submissions. Although I have received permission from Scott to mine his site for content, I may be on shaky ground reprinting other's submissions (if you say so Scott, I'll take this down).
Hammerite is a company that has made a living by producing paints that, when dry, look like a hammered metallic finish. There are two things interesting in this article: First, this is a smooth Hammerite paint; second, the result looks like a fresh bare aluminum mast. Read on...
Hammerite is a company that has made a living by producing paints that, when dry, look like a hammered metallic finish. There are two things interesting in this article: First, this is a smooth Hammerite paint; second, the result looks like a fresh bare aluminum mast. Read on...
Mr Charles McGrory of Glasgow Scotland recently contacted me to comment on the site and offered up some projects he has done on his boat. He has an Ohlson 38 he has restored and this was one of his projects to brighten up his mast by painting it. Over the next week or so I will try and put up a nice project he has for a watch standing seat in the companionway.
From Mr. McGrory:
When I bought my boat in Oct 2010 ,the mast was very badly weathered. I considered having the mast stripped and then painted with Awlgrip. I thought about a new mast but Sailspar in England kindly told me that the original mast would be of much thicker section than the masts of today. And a new mast of thinner section would be approx £5000 without the tangs etc. I did not strip the mast at all. I had this tip from another Ohlson 38 owner who is near Ipswich; he guards his privacy so I can’t mention his name. He touches up his 30 yr old mast with a Hammerite Smooth spray can. My mast was ghastly as you can see.
I tried the Hammerite Smooth spray can just for the hell of it; could not look any worse, and could see a big improvement but the paint was showing weeping run marks from too heavy a shot of aerosol; I quickly changed to a normal can £20 and a hair brush. I had so little faith that it would work, it was all just an experiment, anything would look better. However, in one warm sunny afternoon I did the whole mast which was down for the boat going into the paint shed. What a difference! It just took a wee bit care to not paint over ropes, shrouds etc. I painted all the way to the masthead crane.
The professionals in the paint shop who had quoted me ££££ for undressing the mast, Awlgrip etc later said it was fine (well almost) and next time to use a foam brush to avoid any texture from the hair brush. I was so satisfied that it was so quick and cheap. To be sure I can see the brush texture in some places – invisible at any distance. The coating without any primer – just a light prior washing off of any grit – has stayed on and seems tough enough. I expect that with ropes etc slapping it will thin out where the ropes rub but the foam brush touch up will be fine. I still have half the can of Hammerite Smooth.
Mast before painting.
Mast After PaintingI want to thank Mr. Charles McGrory for submitting his write up of this project. It is a nice product and idea for an inexpensive but durable update to an old mast to make it look better and give it some additional protection.
You can find Hammerite Paint here.
Labels:
products,
rigging,
s/v Valkyr
Tuesday, January 14, 2014
Wire chase/conduit through cabin top
Scott had need to run several (heavy) wires on s/v Valkier, from the deck under the dodger into the interior. Not using new-fangled wire glands (he'd have needed a lot of them...), Scott opted for the time-honored solution of a standpipe. Read on...
We needed to run 4-AWG cable from the solar panels on the new hard dodger down below as well as route the cable for a GPS antenna and 12 volt accessory power to under the hard dodger. We decided to use 2 inch PVC pipe with a 180 degree bend in the pipe to keep water out of the boat. The following pictures show the drilled holes and filling of the core and then gluing of the pipe in to the cabin top with epoxy.
We drilled the big hole for the pipe and took the opportunity to fill in with epoxy some bolt holes for hardware that was no longer there
You can see where we removed the core to fill with epoxy to seal it
Duct tape worked great for sealing the bottoms of the holes so that epoxy did not leak down below
The shows where epoxy has filled in the core and around the standpipe
Most of excess epoxy cleaned off
Underneath after tape was removed
Eventually after the non skid is put on we will also paint the PVC pipe.
Finished wire conduit. Eventually the deck will be sanded and new non skid will go around and over all holes
Labels:
deck leaks,
electrical,
s/v Valkyr
Tuesday, December 10, 2013
Extra insulation over the fridge
Scott aboard s/v Valkier has a quick and easy way to put some more thermal efficiency in your refrigerator:
Using Reflectix and vinyl we created a cover for the top of the fridge. This is a super easy and cheap project that improves fridge efficiency significantly. Eventually we will do the same thing behind the kitchen utensil holder on the front of the fridge. If you slide your hand between the Reflectix and the top of the fridge it feels very cold. However on top of the vinyl covered Reflectix it is room temperature.
This is a link to the the insulation. We have used it to make ducting for our window ac unit to vent it down through a top hatch into the salon. We are gradually insulating the cabin walls and overhead with it as we do projects that expose those areas as well as the above project.
Reflectix BP24025 24-Inch by 25-Feet Bubble Pack Insulation
We used hvac tape to secure the vinyl to it.
Labels:
refrigeration,
s/v Valkyr
Tuesday, November 12, 2013
Extension Cords
Extension cords are a pain. They seem to tangle themselves into knots when they are unsupervised in a locker somewhere. Scott on s/v Valkier has a suggestion...
So someone asked me about what I use for an extension cord on the boat because of a comment I had made about having the perfect one. Everyone knows what a pain extension cords are. They are constantly getting tangled and snarled up, they are a pain to coil back up after using them, they are a pain to un-snarl and pull them out of the cockpit locker after they have become wrapped around every other thing in there. Last but not least is that you can only plug one thing into a standard extension cord. I am constantly having to switch between a drill and a sander or router etc… It just slows stuff down.
How it came about is a long story… lol… not!!!
One day I was in a tool store, not sure where, and saw one of the extension cords in a reel box with 4 outlets built into the box. It was on sale and I thought wow, I need to try that out it would be great on the boat. It has been about a year since that day and it has been everything that I thought it would be and more. The one I got was cheap and I wondered about life span but it is battered and still going strong. Mostly what it has done for me is alleviated a lot of frustration due to the above listed downsides to standard extension cords. It also means that I am more likely to grab stuff to do a quicky project because it is easier to un-spool cable and re-spool it when done. Less time in setup and clean up on both ends of the project. Mine is 25ft in length and I think I want one 50ft and one cable size bigger. However I would bet that I mostly keep using the 25ft one due to size. A 50ft cord and reel will be substantially larger.
Labels:
s/v Valkyr,
tools
Wednesday, October 23, 2013
Shelves instead of hanging space
Over on s/v Valkier, Scott has converted a small hanging locker to shelving. Here is the final product:
We replaced the hanging rod in the closet on port side in the v-berth with three Cedar shelves. It has increased usable storage space by about a factor of four.
Labels:
Downeaster Yachts,
s/v Valkyr,
stowage
Tuesday, June 4, 2013
The Ergonomics of Living on a Boat, Spice and Tea Racks
Over on s/v Valkier, Scott has a couple of projects going - one to add Reflectix insulation to the cabin top and sides, and this one, to add galley stowage:
We have been living aboard for a year now. It has highlighted some of the drastic downfalls of boats and storage. The Downeaster 38 has a huge amount of storage space, however it isn’t particularly of a shape or size to make efficient use of. We are gradually rebuilding all the storage compartments etc into better shapes to hold particular goods both efficiently and securely. One such project that I just finished day before yesterday was tea and spice racks.
I like to drink hot teas and being me go a bit overboard on the acquisition and storage of lots of different loose leaf teas. I have about 40 plastic containers with O ring seals with tea’s in them. At the house it was no big deal, I had a cupboard that they all neatly stacked in. On the boat there is no cupboard the right size and being that it moves they would fall over anyways and end up in a big jumble. In real life I found that a big jumble just due to the shape and size of the storage areas available was how things stayed.
I also like to cook and tend to have about a dozen spices, oils and other condiments that I use on a daily to weekly basis, with another 20 or so that I use weekly to monthly. Again, can we say jumble. I could never find what I wanted.
This state of affairs both in the teas and the spices tended to leave me a bit grumpy and irritated at having daily usability issues. If something is bad enough that it is affecting my outlook on life then it needs to be fixed. What to do though? I really didn’t like the cabinets as a solution as small stuff gets hidden behind other stuff, it all falls down and slides around and; well lets just say jumble. We had a little spice rack shelf over the stove/under the window. It just wasn’t the right size and the capacity was about 10 small spice bottles. I finally took it out and moved it because it just cluttered the area up to little return and made it harder to get into and see into the cabinets behind the stove. Setting stuff on the counter tops is obviously not a solution. We had some big plastic O ring sealing containers that we could put the spices in and store under the settees, but, again not an efficient solution. I hate having to dig under the settee for stuff.
Finally I noticed these two big empty areas on the rear cabin bulkheads just over the fridge and behind the chart table. They were covered in vinyl headliner which we had already made plans to pull down and replace with a wood panel. What if we installed the wood panel and screwed some shelves designed for the tea containers and spices there. But there is a problem. The spaces are not square and the cabin side there leans forward at about a 10 degree angle. If you put shelves there then anything on them would want to slide right off the front of them without a fiddle board or some other positive method of retaining them. At an angle like that even a little bounce would probably bounce stuff over the fiddle board as well. Then all those spices bottles would clink clink clink as the boat rolls and moves on the ocean. Not to be stopped in my desire to make that space work, I came up with a design with no fiddle board, but with individual bungee loops for each container that holds it against the back of the shelf. The boat could turn upside down and nothing would fall out and with each container and bottle individually held securely, there would never be any noise from bottles or containers clinking against each other.
We ended spice rack on portside in the galley that could hold 36 spice containers and various bottles. On starboard a more vertically oriented set of shelves could hold approx 50 of the plastic containers holding tea or spices.
Here are some pictures of the build process. It took a few days to finish due to the multistage process involved.
Starboard aft cabin face with wood lathing being glued
into place. Panel and shelves will be screwed to this.
As you can see above I epoxied 1/4 inch thick oak lathes to the perimeter of the space the wood panel and shelves are going to be mounted on. I had some oak scrap sitting around and ripped it on a table saw into quarter inch thick lengths. I then treated all the lath with penetrating epoxy to permanently protect it from water damage, mold, mildew etc.. After that cured I cut four lengths per side for port and starboard and epoxied them in place as show above. I used a Raka two part Fast cure epoxy for all the epoxy usage in this project other than the penetrating epoxy which was cpes or rot doctor epoxy. To make a bog of the epoxy to glue the wood lathe strips down I just mix in some sawdust to get it to a peanut butter consistency.
Starboard wood panel in place
Here is the starboard panel screwed into place to test the fit and to mark all the mounting holes that will need to be drilled. I held the shelve units against the panel and traced both sides of all the perimeter boards and shelves onto the panel. Then went back in and drilled my holes in the panel from the front side while it was temporarily mounted. Once all holes had been drilled both for attaching the panel to the lath strips and for the shelves to the panel, I took the panel down and ran a couple screws into the shelves from behind the panel to get the shelve aligned with the marks I had made. I then used the holes in the back of the panel to guide a countersink drill to pre-drill all holes into the shelving.
The panel is made out of a high quality luan/underlayment from Lowes at about 20 dollars a sheet. I have used this in other projects and it is very resistant to warpage or de-lamination due to sun, water etc. The template to cut out the panels was made with paper that I taped up and cut out to the shape of the bulkhead. I cut the panels out with one of the Harbour Freight multifunction tools that cut by vibration. Both panels were treated front and back with Penetrating epoxy to give permanent protection against water damage, mold, rot, etc. Once the penetrating epoxy cured (about two days) I then painted the exposed surface with a clear two part epoxy to give it a clear gloss. I had not painted it at this point shown here.
The same procedure was used on the Starboard panel
Portside Wood panel in place.
Spice rack.
Made of a luan panel with a teak shelf screwed to it.
Here you get to see the starboard panel and shelf unit just before it is mounted to the bulkhead. The Shelves were made of some 5/8 inch thick teak boards I purchased from a friend for 35 dollars. I Cut them the depth I needed and then ripped the 5/8 inch board down to just over 1/4 inch thick boards. I used #6 stainless wood screws countersunk into the shelves to screw them together. The port side shelves had some exposed screws and I used #8 bronze 3/4 inch screws there. I just thought the bronze would look better than the stainless. The shelf units are attached to the back panel with #6 3/4 inch long stainless screws run from the backside into the edge on shelf frame and shelves. I used a lot of screws and it is very securely attached.
At this point I figured out the spacing of the holes I would need to drill to weave the bungee in and out of the back of the unit so that I had loops to hold the tea containers and the spice bottles and other containers. There are 48 holes drill just in the left hand side of these shelves. I tried something different at my wife’s suggestion on the right hand side where you just see four vertical runs of bungee. It is working so far but we will have to see how it does under way bouncing around. The left hand side there will be no problem with, but it was much much more labor intensive to do. Between the port and starboard shelves I used in excess of 60 ft of bungee cord. I routed and or sanded the outer facing edges of all the shelves and gave a good sanding to the shelves and frame. I have not treated the teak with anything yet but will probably use some tung oil on them before long.
Starboard side with reflectix taped into place and
headliner held up at bottom ready to be screwed
down under the wood panel.
One of the goals of this project was to upgrade the insulation. The old headliner was vinyl with an air gap between it in the overhead and on the sides of the hull some 1/4 inch thick foam. It actually worked quite well for what it was. We decided to use 1/4 inch thick Reflectix insulation. I cut it to the exact inside dimensions of the lath strips and then taped it down inside that area all around the perimeter so that it is sealed air tight. I just used a high grade duct tape to do this with. I then pulled up the headliner that we didn’t cut out and taped it up so that when we screw the panel down, it will secure the headliner between the panel and the bottom piece of lath.
Empty Tea Rack on starboard. Bungies showing.
Here is the finished unit mounted in place.
Starboard side tea rack.
Tea containers in place. You can see the gloss of the epoxy coat on the panel behind the tea containers.
Portside reflectix in place.
Empty spice rack.
You can see how the bungie cords are woven in and out
of the back panel.
Portside spice rack and panel mounted. Again you can see how the bungees are woven through the back panel. I did it differently on each panel. Starboard on the tea shelf the bungee holes are side by side. Because of the design of the containers I had room to do that and it holds them more securely. However on portside for the spice rack the bungee holes are one above the other. Most of the spice bottles are straight up and down in design and it took up less space between them to run the bungee back and forth through the back panel this way.
Spice rack installed
Here you can see the spice rack with bottles, jars and containers of spices in place. This shelf has a depth of 2.5 inches. I sized it according to the largest diameter container that I commonly would have on it. The starboard side tea rack is 4 1/4 inches in depth to match the containers I use for storing tea. If you click on the image and look at the full size image, you will see the screws and washers I used to attach the panel to the wood lath strips behind it. I again used #6 3/4 inch stainless screws and matching stainless finishing washers to give a nice appearance to the exposed screws.
Finished Racks with Tea containers on starboard and spice racks on port.
Just to give you an idea of how the finished shelves with stuff on them looks. As you can tell we haven’t finished replacing the headliner in the overhead just in front of the shelves so please pardon that part of it. Soon there will be drop down bins built into those areas both port and starboard for more spice storage and misc other things.
We were worried how theses shelves would look and function, but I was determined to try it out as we really didn’t have a better solution we could think of. I wasn’t sure how they would look with shelves leaning forward and angle down at the outsides as they follow the incline of the back cabin face and deck camber. However once they were up the give a nice symmetrical appearance, that I at least like. They are a bit busy with all the containers of tea and spices exposed. However I already have in mind another project to put some doors made out of dry erase white board material over them. This would lighten the area back up and also give us a place to create shopping lists, or note down navigation details until they can be transferred to the log book. All in all I am very please with this project. My total cost was somewhere in the neighborhood of about 100 dollars for both sides for the materials and I have about 15 hours of labor in it spanning a few weeks between ripping out the old headliner, templating, cutting and treating all the materials used and then installing it all.
Labels:
carpentry,
Downeaster Yachts,
galley,
s/v Valkyr
Subscribe to:
Posts (Atom)






















































